Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7.
dc.contributor.advisor | Proaño Maldonado, Xavier Alfonso | |
dc.contributor.author | Chasiloa Chiluisa, Diego Xavier | |
dc.date.accessioned | 2023-06-20T21:13:23Z | |
dc.date.available | 2023-06-20T21:13:23Z | |
dc.date.issued | 2023 | |
dc.description | The company EP Petroecuador in block 7 Oso B has a 13.6 MW electricity generation plant since 2015, in charge of generating energy for the Oso B and Oso I locations; and due to failures or mismatches in the electrical protections during its operation, they cause economic losses for the company. The purpose of this work is to collect information and evaluate the adjustments of the electrical protections at the level of 4.16 and 13.8 kV of the generation plant, and through a modeling of the electrical system in the ETAP 20.0 software, it was simulated: flows power, short circuits and equipment failures to obtain the different relay coordination curves. | es_ES |
dc.description.abstract | La empresa EP Petroecuador en el bloque 7 Oso B dispone de una planta de generación eléctrica de 13,6 MW desde el año 2015, encargada de generar energía para las locaciones Oso B y Oso I; y debido a fallas o desajustes en las protecciones eléctricas durante su funcionamiento, provocan pérdidas económicas para la empresa. El presente trabajo tiene como propósito recopilar información y evaluar los ajustes de las protecciones eléctricas a nivel de 4,16 y 13,8 kV de la planta de generación, y mediante un modelado del sistema eléctrico en el software ETAP 20.0, se simuló: flujos de potencia, cortocircuitos y fallas en los equipos para obtener las diferentes curvas de coordinación de relés. | es_ES |
dc.format.extent | 138 páginas | es_ES |
dc.identifier.citation | Diego Xavier Chasiloa Chiluisa (2023); Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. UTC. Latacunga 138 p. | es_ES |
dc.identifier.other | MUTC-001512 | |
dc.identifier.uri | http://repositorio.utc.edu.ec/handle/27000/10444 | |
dc.language.iso | spa | es_ES |
dc.publisher | Ecuador : Latacunga: Universidad Técnica de Cotopaxi (UTC) | es_ES |
dc.rights | openAccess | es_ES |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/3.0/ec/ | es_ES |
dc.subject | GENERADORES | es_ES |
dc.subject | PROTECCIONES | es_ES |
dc.subject | BREAKER | es_ES |
dc.subject | RELÉS | es_ES |
dc.subject.other | ELECTRICIDAD | es_ES |
dc.title | Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. | es_ES |
dc.type | masterThesis | es_ES |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- MUTC-001512.pdf
- Size:
- 7.64 MB
- Format:
- Adobe Portable Document Format
- Description:
- PROYECTO DE POSGRADO A TEXTO COMPLETO
License bundle
1 - 1 of 1
Loading...
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: